CHAPTER 14 - MONITORING FRAMEWORK

 

INTRODUCTION

14.1     As part of the process of preparing the LDF, it will be necessary to identify an effective monitoring framework against which implementation of the LDF strategy and vision can be measured. This in turn will help to identify any changes that need to be made if a particular policy or suite of policies within the LDF are not delivering their intended outcomes.

 

PERFORMANCE INDICATORS

14.2            Indicators will be identified to show how the performance of the Core Strategy will be measured. The Government identifies the monitoring process as one that will evolve over time as new information becomes available and lessons are learnt. Indicators may as a consequence change or be refined over time to reflect this evolving process. It is not practicable to include an indicator for every policy in the Core Strategy or other LDF documents. Where possible, policies will be grouped and common indicators identified.

 

ANNUAL MONITORING REPORT (AMR)

14.3     The AMR will be the principal component in the monitoring framework, bringing together all the necessary information to successfully monitor the implementation of the LDF in one place. It will be published by December each year and will include an assessment of:

  1. whether policies and related targets or milestones in LDDs have been met or progress is being made towards meeting them or, where they are not being met or not on track to being achieved, the reasons why;
  2. what impact the policies are having in respect of national, regional and local policy targets and any other targets identified in LDDs;
  3. whether the policies in the LDD need adjusting or replacing because they are not working as intended;
  4. whether the policies need changing to reflect changes in national or regional policy; and
  5. whether policies or proposals need changing, and the actions needed to achieve this.

 14.4     The following targets and indicators will be used to monitor implementation of the Core Strategy. This will be refined through the AMR.

INDICATOR TYPE OF INDICATOR CORE STRATEGY POLICIES SPATIAL OBJECTIVES TARGET EXISTING BASELINE (WHERE APPROPRIATE) SOURCE
Spatial Strategy and Core Development Principles
Housing trajectory showing:
  1. net additional dwellings over the previous 5 year period;
  2. net additional dwellings for the current year;
  3. projected net additional dwellings to 2023;
  4. the annual net additional dwellings requirement; and
  5. annual average number of net additional dwellings needed to meet overall housing requirements having regard to previous year’s performance.
Core CS1, CS9 3, 5 Net additional dwellings:
  • 2004-11=3,080
  • 2011-16=2,325
  • 2016-23=1,960
N/A Housing completion certificates
 Greater Hemlington:
  • Amount of employment floorspace permitted
  • Amount of employment floorspace completed
Local CS3 6, 7, 9 2004-11
5,000 sq.m
2011-16
25,000 sq.m
2016-21
20,000 sq.m
N/A Planning applications/
completions certificates
Greater Middlehaven:
  • Number of dwellings permitted
  • Number of dwellings under construction
  • Number of dwellings completed
  • Number of affordable units as a percentage of total new build
Local CS2, CS9 3, 5, 6 2004-11
500 completions
2011-16
1,015 completions
2016-21
1,265

completions10% of new build will be affordable
1,336 dwellings permitted (outline consent)733 units in phase 1 have planning permission, without affordable housing requirement Planning applications/
completion certificates
Greater Hemlington:
  • Number of dwellings permitted
  • Number of dwellings under construction
  • Number of dwellings completed
  • Number of affordable units as a new build
Local CS3, CS9 3, 5, 6 2004-11
190 completions
2011-16
375 completions
2016-21
215 completions 10% of new build will be affordable
N/A Planning applications/
Completion certificates
Amount of new residential development within 30 minutes public transport time of: GP; hospital; primary school; secondary school; areas of employment and a major retail centre(s) Core CS4, CS17 3, 4, 10, 11 All residential development to be within 30 minutes public transport time of identified facilities N/A Completion certificates
Changes in areas and populations of biodiversity importance including:
  1. changes in priority habitats and species and
  2. changes in areas designated for their intrinsic environmental value including sites of international, national, regional, sub regional or local significance
Core CS4, CS20 3, 4, 10, 11 To maintain and increase biodiversity of priority habitats as set out in Local Biodiversity Action Plans Designated SNCIs: 115 ha; Proposed SNCIs:
57ha
Tees Valley Wildlife Trust
Number of planning permissions granted contrary to the advice of the Environment Agency on either flood defence or water quality grounds Core CS4, DC1 3, 4, 10, 11 No permissions granted contrary to the advice of the Environment Agency N/A Environment Agency/
Development Control
Amount of municipal waste arising and managed by management type and the % each management type represents of the waste managed Core CS4 3, 4, 10, 11 To recover value from 40% of municipal waste. To include recycling/
Composting of at least 25% of household waste
12% of household waste recycled/
Composted
JSU
Renewable Energy.
Installed capacity
Core CS4 3, 4, 10, 11 To increase the amount of energy generated from renewables N/A Planning applications/
Completion certificates
Number of Grade I and Grade II* listed buildings on ‘Buildings at Risk’ register Significant effect CS4 3, 4, 10, 11 No buildings on the list 0 English Heritage
Amount of eligible open spaces managed to Green Flag Award standard Core CS5, CS20 3, 4, 11, 12 Increase the amount of eligible open space managed to Green Flag standard 85ha Leisure & Arts
% new residential completions achieving BRE Ecohomes rating of excellent Local CS5 3, 4, 11, 12 100% N/A Planning applications
% new non residential building completions achieving BRE Environmental Assessment Method of excellent Local CS5 3, 4, 11, 12 100% N/A Planning applications
Business Development
Amount of floorspace developed for employment by type
Core CS1, CS7 1, 2, 6, 7, 9 General employment land:
5ha/annum;
Regional brownfield mixed use:
5.9ha/annum
N/A Completion certificates
Employment land available by type Core CS7, CS1 1, 2, 6, 7, 9 2004-2011: 35ha General. 40ha Brownfield mixed. 2011-2016: 25ha General. 40ha Brownfield mixed. 2016-2021: 25ha General. 20ha Brownfield mixed Local Plan employment allocations: 93ha Land Availability Study
Employment type Contextual CS7 1, 2, 6, 7, 9 N/A Public admin 31%
Distribution 21%
Manufacturing 14%
Finance 11%
Other 23%
JSU
Economic activity Contextual CS7 1, 2, 6, 7, 9 Increase economic activity rates 67% Census
Losses of employment land in:
  1. employment/ regeneration areas and
  2. local authority areas
Core CS8 9 To ensure employment land and premises are not lost prematurely N/A Planning applications/
Completion certificates
Amount of employment land lost to residential development Core CS8 9 To ensure employment land and premises are not lost prematurely N/A Planning applications/
Completion certificates
Housing
Population change
Contextual CS9, CS10, CS11 3, 5 Reduce the rate of population decline to 0.7% between 2001-11 137,300
(mid-2006)
Census/JSU
Mid-year estimates
House prices Contextual CS9, CS10, CS11 3, 5 To create a better balance between housing supply and demand Average price (Oct-Dec 2006) £120,738 JSU (land registry)
Household composition Contextual CS9, CS10, CS11 3, 5 Create a balanced housing stock that meets the population’s needs Multi-person 48%
Single person 31%
Couples 22% (2001)
Census
Affordable housing completions Core CS10, CS11 5 Improve the range and choice of dwelling types N/A HIP
Outstanding planning permissions Local CS1, CS9 3, 5 To maintain a 5 year deliverable supply of housing from outstanding permissions and allocations Planning permission for 3,643 dwellings at 1st January 2007 Planning decision notices/ completion certificates
Number of housing completions/ outstanding planning permissions on strategic allocations Local CS9 3, 5 Completions
2004-11=1,388
2011-16=2,300
2016-21=1,410
Outline planning permission for 1,336 dwellings Planning decision notices/ completion certificates
Number of apartments permitted/completed in:
  • Greater Middlehaven
  • Town Centre
  • Other areas
Local CS2, CS9 3, 5 To focus development of apartments in Greater Middlehaven and the Town Centre N/A Planning decision notices/
Completion certificates
Housing Stock Significant effect CS9 3, 5 Improve the range and choice of dwelling types and sizes Detached:
12.4%
Semi: 38.5%
Terraced:
37.6%
Flat: 11.4%
(2004)
DCLG
Housing on previously developed land Core CS9 5, 11, 12 70% of new build N/A Planning applications/
Completion certificates
Vacant dwellings Significant effect CS9, CS11 5 Reduce vacancy rates to 3% by 2016 4.4% (2005) Council tax records
Dwellings in low demand Significant effect CS9, CS11 5 To turn around the incidence of low demand and abandonment 15.4% (2005) HIP
Affordable housing completions by type and tenure Local CS11 5 Improve the range and choice of dwelling types N/A HIP
Planning applications approved/refused for gypsy and travelling show people sites and appeals Local CS12 5 Ensure that there are sufficient well located sites N/A Planning decision notices
Number of unauthorised gypsy encampments Local CS12 5 No unauthorised gypsy encampments N/A Planning decision notices
Number of unauthorised gypsy encampments Local CS12 5 No unauthorised gypsy encampments N/A Environment Directorate
Town Centre
National retail ranking
Contextual CS13 1, 2, 9 Improve national retail ranking to 25th by 2023 2004: 38th Verdict analysis
Amount of completed retail, office and leisure development Core CS13, CS14, CS15 1, 2, 9 Convenience floorspace:
2006-16 = 2,800sq.m.
Comparisons:
2006-16 = 41,900 sq.m.
N/A Completion certificates
Amount of completed retail, office and leisure development in town centres Core CS13 1, 2, 9 Maintain and enhance the vitality and viability of the town centre N/A Completion certificates
Floorspace permitted/
Refused for town centre uses in:
  • town centre
  • edge of centre
  • out of centre locations
Local CS13 1, 2, 9 Maximise development within the town centre N/A Planning applications
Amount of leisure development permitted/
Developed in:
  • the town centre;
  • Greeen Blue Heart (GBH), Middlehaven and Prissick; and
  • District centres
  • Other locations
Local CS14 1, 2, 12 Focus leisure development in the town centre, GBH, Middlehaven, Prissick and the district centres N/A Planning applications/
Completion notices
Planning applications permitted/refused for a large casino Local CS15 1, 2 Provide a large casino in Middlesbrough N/A Planning decision letters
  • Number and percentage of major planning applications approved that include developer contributions
  • Total level of contribution – infrastructure/ social/ environment
Local CS6 13, 14 Ensure that developer contributions cover the cost of infrastructure, social and environmental requirements arising from new development N/A Planning applications
Total number of units and number of vacant units in the town centre. Total amount of floorspace and vacant floorspace within town centre Significant effect CS13 1, 2, 9 Reduce the number of vacant units 419 retail units
71 vacant
Annual survey
Total number of units and number of vacant units in the district centres. Total amount of floorspace and vacant floorspace within the district centre Significant effect CS13 9 Maintain and enhance the vitality and viability of the town centre Berwick Hills:
16 retail
0 vacant
Coulby Newham:
29 retail
1 vacant
Annual survey
Education
Educational attainment. Qualifications of working age populations
Contextual CS16 13 To increase the % of residents attaining education qualifications   63% JSU/annual population survey
Number of new schools built/created. Building Schools for the Future Local CS16 13 To provide modern purpose built education facilities. All new residential to be within 30 minutes of the listed facilities N/A Planning applications/
Completions
Transport
% of new development within 400m walking distance of a bus stop, rail halt or similar access to public transport
Local CS4, CS17 7, 8, 9 100% N/A Planning applications/
Completions
Total length of footpath network. Total length of footpaths secured/lost in new development Local CS4, CS17 7, 8, 9 Achieve a net increase in the total length of footpaths Total length:
38km
Transport & Design
Commuting patterns Contextual CS17 7, 8, 9 Reduce the % of people commuting by car 66% by car Census
Percentage of completed non residential development within UCO A, B & D complying with car parking standards set out in the local development framework Core CS18 8 To ensure all development complies with maximum car parking standards to encourage alternatives to the car N/A Planning Apps. Angela Hughes. Transport & Design
Number of short stay and long stay parking spaces in existing centres Local CS18 8 Restrict parking spaces to current levels Long stay:
2204 spaces
Short stay:
1503 spaces
Transport and Design Monitoring
Report
1503 spaces
Length of additional no car lane, bus lane and segregated cycle lane (m) Local CS18 8 To encourage the use of public transport and cycling N/A Transport and Design Monitoring Report
Number of people killed or seriously injured (KSI) Contextual CS19 8 By 2010-40% reduction in no. of people KSI. 50% reduction in no. of children KSI. 10% reduction in no. of people slightly injured 65 Transport and Design Monitoring Report
Number of non-residential developments incorporating Workplace Travel Plans Local CS18 8 All major developments that generate significant additional journeys N/A Planning conditions
Quality Environment
% green wedge lost to development
Local CS20 3, 7, 12 No loss of green wedge to inappropriate development 941ha designated as green wedge Planning applications
Area primary open space lost to development Local CS20 3, 7, 12 No loss of primary open space to inappropriate development 894ha designated as primary open space Planning applications
Planning applications determined for significant sport, leisure and recreation related developments on the Green Blue Heart Local CS21 1, 12 Increase opportunities for sport, leisure and recreational work N/A Planning applications
Development Control
Performance in relation to National Air Quality Strategy. Declaration of any Air Quality Management Areas?
Contextual DC1 12 Reduction in number of days when the level of air pollution exceeds AQMA threshold 0 Tees Valley environmental group

Existing baseline data 2005/06 unless otherwise stated.